A conveyance system of approximately 125 km total length — 21,248 m walled canal, 99,650 m trapezoidal canal and 3,780 m tunnel — carrying 70 m³/s of water. Through Mavi Tunnel and other facilities, water is transferred via the AHI Canal to the Konya plain.