All Projects
17.657 ha
Area
Şanlıurfa
Location
DSİ
Client
Tamamlandı
Status
Suruç Plain Pump Irrigation Taşbasan Right Bank Network Project
Suruç Plain Pump Irrigation Taşbasan Right Bank Network Project
Suruç Plain Pump Irrigation Taşbasan Right Bank Network Project
Suruç Plain Pump Irrigation Taşbasan Right Bank Network Project
Suruç Plain Pump Irrigation Taşbasan Right Bank Network Project

Construction of pipelines and art structures to irrigate a total gross area of 17,657.30 ha under the Suruç Plain Pump Irrigation Right Bank Main Canal.

Project Details

Client
General Directorate of State Hydraulic Works (DSİ)
Location
Şanlıurfa / Turkey
Category
Irrigation
Structure Type
Piped Network for Irrigation
Status
Completed

Similar Projects

Other projects in the Irrigation category