Approximately 14 km of double surface treated road construction at 2 separate locations with road relocation; landslide prevention works (walls, excavations, etc.) on existing roads; and BSK road construction connecting 4 villages to the KGM road.
Approximately 14 km of double surface treated road construction at 2 separate locations with road relocation; landslide prevention works (walls, excavations, etc.) on existing roads; and BSK road construction connecting 4 villages to the KGM road.
Other projects in the Road category