Koçali Dam is planned to irrigate a gross area of 18,119 ha west of Adıyaman and generate 98.75 GWh/year with 38.6 MW installed capacity. Height from thalweg: 118 m, crest length: 610 m, total body volume: 5,339,268 m³.
Koçali Dam is planned to irrigate a gross area of 18,119 ha west of Adıyaman and generate 98.75 GWh/year with 38.6 MW installed capacity. Height from thalweg: 118 m, crest length: 610 m, total body volume: 5,339,268 m³.
Other projects in the Dam & HEPP category