All Projects
353 m
Road
574 m
Tunnel
Silvan
Location
DSİ
Client
Babakaya Tunnel Entrance Water Intake Structure Cover Shaft Access Road

353 m long, 7 m wide stabilized road construction and 574.20 m long, 6 m inner diameter tunnel construction.

Project Details

Client
State Hydraulic Works (DSİ)
Location
Silvan / Diyarbakır
Category
Road
Structure Type
Stabilized Road and Tunnel
Status
Completed

Similar Projects

Other projects in the Road category